Design + partial general contracting, open pit mining, copper wet mining project
The mining and processing scale of the first phase of the project is 4550kt/a, with an annual output of 63.7kt/a of copper sulfide and cobalt concentrate. The copper oxide concentrate uses a wet process to obtain cathode copper of 83kt/a, and the cobalt metal amount is 1.8kt/a (cobalt hydroxide product) .





